Slayers-Run-Building-in-Progress (13 Photos)
Click to select an image. Click and drag to select multiple images. Shift+click to add/remove from your selection.
-
Newmarket, Ontario
talon: Slayers-Run-Building-in-Progress
in: Digging/Building130 views
Slayer's Run
N/AThe second berm is 80% complete.
-
Newmarket, Ontario
talon: Slayers-Run-Building-in-Progress
in: Digging/Building160 views
Slayer's Run
N/ALooking back on the first table from the 2nd berm.
-
Newmarket, Ontario
talon: Slayers-Run-Building-in-Progress
in: Digging/Building200 views
Slayer's Run
N/ANew pump track berm started.
-
Newmarket, Ontario
talon: Slayers-Run-Building-in-Progress
in: Digging/Building231 views
Slayer's Run
N/AFirst little floater on the pump track.
-
Newmarket, Ontario
talon: Slayers-Run-Building-in-Progress
in: Digging/Building209 views
Slayer's Run
N/ARun in is all worked in and the second step down is roughed in. Probably needs another 30 minutes to be finished.
-
Newmarket, Ontario
talon: Slayers-Run-Building-in-Progress
in: Digging/Building231 views
Slayer's Run
N/AThe old step down is reshaped. Working on clearing the entire run in. Also building a warm-up/younger rider step down marked by the shovels.
-
Newmarket, Ontario
talon: Slayers-Run-Building-in-Progress
in: Digging/Building221 views
Slayer's Run
N/AThe twin booters are good to go.
-
Newmarket, Ontario
talon: Slayers-Run-Building-in-Progress
in: Digging/Building213 views | 2 comments
Slayer's Run
N \ AExit out of the second berm. I'm not really sure what the other builders were trying to do with the two little jumps on the left. The path down the middle leeds to the first step down.
-
Newmarket, Ontario
talon: Slayers-Run-Building-in-Progress
in: Digging/Building200 views
Slayer's Run
N \ A2nd berm. 80% of this berm was built by someone else. I have been redoing the jump leeding into it and making it taller.
-
Newmarket, Ontario
talon: Slayers-Run-Building-in-Progress
in: Digging/Building177 views
Slayer's Run
N \ AThe first step down in the 3 set with the other 2 in the back ground.
-
Newmarket, Ontario
talon: Slayers-Run-Building-in-Progress
in: Digging/Building187 views
Slayer's Run
N/AThis is below my original step down from 05. The right part was there but in pretty bad shape. I'm adding a side jump with less lip for high speed runs.
-
Newmarket, Ontario
talon: Slayers-Run-Building-in-Progress
in: Digging/Building202 views
Slayer's Run
N/AThe very bottem jump rebuilt and ready to go
-
Newmarket, Ontario
talon: Slayers-Run-Building-in-Progress
in: Digging/Building267 views | 3 comments
Slayer's Run
N/A2nd last jump on the way down. Rebuilt and good to go.