Putting in work. Air ride rebuild part 1. Part 2 when more parts arrive. Still plan to change more fittings, front bags, shocks, and some other shit. I spy turndowns.
You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login
Putting in work. Air ride rebuild part 1. Part 2 when more parts arrive. Still plan to change more fittings, front bags, shocks, and some other shit. I spy turndowns.
2 Comments
  • 2 0
 Those cutouts though. That's hot.
  • 1 0
 I like them too. Zach and I did a good job on that. Him with the drunken torching and I did a lot of grinding and test fitting while he let drunk girls cut his hair. Hahahahahaha. Shop party was going on while we were doing that. LOL.







Copyright © 2000 - 2024. Pinkbike.com. All rights reserved.
dv65 0.016518
Mobile Version of Website