Putting in work. Air ride rebuild part 1. Part 2 when more parts arrive. Still plan to change more fittings, front bags, shocks, and some other shit. I spy turndowns.
I like them too. Zach and I did a good job on that. Him with the drunken torching and I did a lot of grinding and test fitting while he let drunk girls cut his hair. Hahahahahaha. Shop party was going on while we were doing that. LOL.