well in the uk the full builds arive on the 16th december at the latest and the frames are 23rd of decemmber im not sure for france possibly in the next week or two weeks
well in the uk the full builds arive on the 16th december at the latest and the frames are 23rd of decemmber im not sure for france possibly in the next week or two weeks
does anyone know if the 2011 demo FRAME comes with the headset pressed in already? I talked to specialized and they said it uses drop in bearings but they wouldnt really say if it came pressed in or if it even came with the headset at all.
Harrogate concept said Jan 24 for mine, but from what ive read on here its not written in stone! The whole finance thing did it for me, can break up the old bike and sell it no need for the cash all at once. Might keep me boxxer teams to make sure the world cups are all theyre meant to be. Excited about getting it, i went for a large originally but bottled it , it would of being here 3 weeks earlier, mediums must be in demand...8 inch of snow outside so no rush yet
A friend told me, its problems with disc 203 in back break touch the frame, any body know anything.
thats what I have heard. I talked to a guy on here who had one of the display (pre-production) frames and he said you have to run a 185mm rotor in the rear due to the lack of frame clearence on the 203mm. They may change it for the production model but I highly doubt it.