build up a 3 foot high landing and then that gap will be buttery smooth and flowy cause all that stuff you dug out could be made into a huge berm right after the gap
looks good dude. i also have around 14acres that im planning on building some stuff on. theres a few cliffs ranging from 8-22ft (8ft, 9ft, 15ft, and 22ft. 15 and 22fter is more for skiing). also will be putting in a few step downs that are around 15-30ft. a lof of rocks and tech riding more than anything. idk if ill build a lot this summer, just clearing the brush and a couple trees for skiing.
I know the pain of wanting the trail done now. . . I am building a new freeride trail too and your's is really awesome because you get to put in man made obsticles. I don't own this land and I am sure anything man made would get everything torn down. I love the 15 gap over the ditch though. Great job!