Powered by Outside

Greenland

Author Message
Posted: Feb 11, 2010 at 12:46 Quote
no super high 20 footer

O+
Posted: Feb 11, 2010 at 12:46 Quote
dicer wrote:
mtbkers wrote:
woodstock144 wrote:
lol, take out that first hip jump, 2nd jump, and third. then space them out more and make them bigger.
the 3rd was built up alot at the end of the season .. i was thinking taking out the first, moving the second jump back and making the landing bigger, then rebuilding the first big enough to get speed for the second.
im tihnkin we go off the first jump land on the 2nd landing pull back 3rd landing make 4th massive
if only that was possible

Posted: Feb 11, 2010 at 12:46 Quote
mtbkers wrote:
Adam-92 wrote:
yeh and the 3rd jump is sick right now i say we make a 10 footer into the line
nooo man super low 15 footer
yea that should be good with our flat run

O+
Posted: Feb 11, 2010 at 12:46 Quote
Adam-92 wrote:
no super high 20 footer
where are we getting all of this speed from adam?

Posted: Feb 11, 2010 at 12:47 Quote
same place for the 15 er

O+
Posted: Feb 11, 2010 at 12:47 Quote
dicer wrote:
mtbkers wrote:
Adam-92 wrote:
yeh and the 3rd jump is sick right now i say we make a 10 footer into the line
nooo man super low 15 footer
yea that should be good with our flat run
i did that at those super shitty jumps at the vine.. worked out good

O+
Posted: Feb 11, 2010 at 12:48 Quote
we need to make a roll in and a berm to go into the main line

Posted: Feb 11, 2010 at 12:49 Quote
k so this will be the first good idea we pull the landing way back on the first one take out the 2nd one (cuz the landing will pretty much be there) use the dirt from the 2nd one to re build 1st landing and make the 3rd nicer

Posted: Feb 11, 2010 at 12:52 Quote
dicer wrote:
k so this will be the first good idea we pull the landing way back on the first one take out the 2nd one (cuz the landing will pretty much be there) use the dirt from the 2nd one to re build 1st landing and make the 3rd nicer

3rd needs redone, it's tall with like no gap at all

Posted: Feb 11, 2010 at 13:15 Quote
we should make a massive run in for the main line and make them huge

Posted: Feb 11, 2010 at 13:18 Quote
forests are bad ideas, takes to long to dry, roots, trees. mother nature Thumbs Down i say we just fix te main line, take the first out and move everything back.

Posted: Feb 11, 2010 at 13:40 Quote
what if we opened up a line from the new step up all the way to the back or something near the pump track? like to the right of where the wooden step down used to be?

O+
Posted: Feb 11, 2010 at 13:50 Quote
christiancasimiro wrote:
what if we opened up a line from the new step up all the way to the back or something near the pump track? like to the right of where the wooden step down used to be?
what?

Posted: Feb 11, 2010 at 13:51 Quote
did uguys no that some f*cker posted directions on how to get there on youtube

Posted: Feb 11, 2010 at 13:57 Quote
yea i saw that what f*cking a*shole
Adam-92 wrote:
did uguys no that some f*cker posted directions on how to get there on youtube


 


Copyright © 2000 - 2024. Pinkbike.com. All rights reserved.
dv65 0.011690
Mobile Version of Website