Hi jus thought id try making a blog. Me and 2 friends are building a new line going so i think having a blog might remind me to get pics of the jumps. Im not going to tell you where these are, they arent private so the less people who know about it the better. so here goes ill trry and keep it updated as i do more work on it. Enentually there should be 4-5 jumps in the line (atm 4) with a few rollers and bombholes between.
The last jump will be designed to have an insane ammount of speed (couple of big pump lumps) and will be a huge trick jump!
Check the To Do's list to see what coming on the next update(s)
TO DO's* Finish the bombhole between the second and third
* Finish the 3rd and 4th landers
* Finish step up roller
* Build step up landing
My work up until now![photo]()
This was the first in the line, now its the second
![photo]()
Different angle
Since then theres been a lot of work.
Update: 07/11/09Just me digging
There is now 3 in the line, the bombhole between the first and second needs smoothing out and making deeper, its pretty sick atm. I did an hours digging today and turned the 1st (which used to be a shitty tabletop) into a pretty big double and did a lot of work on the pit. It was too dark to hit them when i finished.
Update: 08/11/09Just me digging
Got a lot done today, the bombhole between 1st and second just needs raking out to make it smooth, put a different run up on so you can get enough speed, the 1st and second are much better and ive been trying to use trailboss dans jump buildin method but it not working too well i cant get the back of the jumps to be vertical
![photo]()
looking up the line
![photo]()
run ups
![photo]()
from the side
![photo]()
2nd done
Update: 21/11/09Just me digging
Got some more done today, made the 2nd landing much wider, did lots of work on the third takeoff, a bit on the third landing but it needs widening, done a lot on the bombhole between 1st and 2nd, started the roller double, got the logs in place and put a tiny bit of soil but didn't have much time

. Also i got some pics of what is planned

oops made the pics too small
![photo]()
Looking up the line from the 3rd lander
![photo]()
Looking up the line from the 3rd takeoff
![photo]()
the start of the roller double
![photo]()
third and roller double start
![photo]()
bombhole work
![photo]()
looking down the line
**************************PLANS*****************************![photo]()
Roller double, 4th and hip plan
![photo]()
4th and hip plan
![photo]()
hip and 6th plan
![photo]()
6th, 7th, 8th, 9th and 10th (TRICK JUMP) plan
Update: 22/11/09Me and Speshguy digging
Didn't get pics sorry, but the bombhole between the first and second is pretty much done now, its awesome and you get so much speed, im now confident that you will be able to make is over the second and if we can get the same sort of thing done between each of the jumps then it will be sick

. We have started a pump lump on the run up and the roller double is 3/4 done. The pumplump is going to be banked and quite big. Also we got the run up fully raked out so its awesome.
Ill try and get pics tomorrow i make no guarrentees though if not then next weekend for sure.
Update: 23/11/09Just me digging
didn't get pics again it was pissing it down when i left my wheelbarrow was full of water by the time i got there. Did work on 2nd takeoff and pumplump
Update: 27/11/09No digging today, but i got some pics

. sorry it was dark and i had to use the flash
![photo]()
looking up the line from the third
![photo]()
the smoother 2nd lip
![photo]()
f***ing huge pit, smooth as f**k
![photo]()
pumplump in progress
![photo]()
run-up has been cleared out by speshguy, its now sick
Update: 22/11/09Me Speshguy and appallingbook66 digging
finished pumplump and did more work on the pit between 1st and 2nd and 2nd takeoff
![photo]()
pumplump
![photo]()
pitwork
![photo]()
2nd lip
![photo]()
3rd work
Update: 13/12/09Just me digging
Nearly finished the 2nd pump just needs more soil and shaping, 1st bombhole so nearly done, 1 more dig sesh should 'ave it
![photo]()
starting off, shows where the 2nd and 3rd pumps will be
![photo]()
where the 3rd pmp will be
![photo]()
1st and 2nd Pumps
![photo]()
should flow nicely if ive done it right
![photo]()
Pit so nearly done
![photo]()
smoooth
![photo]()
about 4 foot deep
Update: 13/3/10BIG UPDATE
People Digging
Haven't got round to updateing the blog for a while. Last time was EXACTLY 3 months ago. Well here it is.
![photo]()
NEW 1st
![photo]()
NEW 1st
![photo]()
NEW 1st
![photo]()
Flooding
![photo]()
Flooding
![photo]()
Flooding
![photo]()
Berm
![photo]()
Start of step up trick jump
![photo]()
Start of step up trick jump
![photo]()
3rd
![photo]()
NEW 1st
![photo]()
GARY THE TRAIL ROBIN
![photo]()
GARY THE TRAIL ROBIN
![photo]()
GARY THE TRAIL ROBIN
Update: 13/3/10New stuffs
havent been digging much recently due to "doctors advice". anyway, updates:
destroyed the 1st jump because it wasnt giving you enough speed. Everythings dried out now and works good. working on the 2nd pit atm, after its done i can get some vids up of riding. soirry for the crappy quality of pics, they were taken on my camcorder

. i have learned my lesson.
![photo]()
looking down the line
![photo]()
1st pit running niccce
![photo]()
bluebells look soo cool
![photo]()
dry nao
![photo]()
2nd pit
![photo]()
R.I.P