Powered by Outside
Future trail day area.  Muddy area prior to "Daves 2 Skinny" bridge.  It's wide and braided.  Propose raised bed construction to raise the trail above the mud, excavate and remove the mud to create a lower area for water to drain into, and shift the trail corridor more to the left so riders have a straight approach to the skinny bridge.
You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login
Future trail day area. Muddy area prior to "Daves 2 Skinny" bridge. It's wide and braided. Propose raised bed construction to raise the trail above the mud, excavate and remove the mud to create a lower area for water to drain into, and shift the trail corridor more to the left so riders have a straight approach to the skinny bridge.
0 Comments







Copyright © 2000 - 2024. Pinkbike.com. All rights reserved.
dv65 0.014432
Mobile Version of Website