Future trail day area. Muddy area prior to "Daves 2 Skinny" bridge. It's wide and braided. Propose raised bed construction to raise the trail above the mud, excavate and remove the mud to create a lower area for water to drain into, and shift the trail corridor more to the left so riders have a straight approach to the skinny bridge.