Powered by Outside
Future trail day area.  Water is draining across the trail.  Need to build a stone culvert (bridge) to allow water to drain unimpeded.  Rock armouring and/or raised bed construction on either side of the stone culvert.  If we fix the drainage, the area should heal up nicely.
You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login
Future trail day area. Water is draining across the trail. Need to build a stone culvert (bridge) to allow water to drain unimpeded. Rock armouring and/or raised bed construction on either side of the stone culvert. If we fix the drainage, the area should heal up nicely.
0 Comments







Copyright © 2000 - 2024. Pinkbike.com. All rights reserved.
dv65 0.019271
Mobile Version of Website