25ft x 8ft set-up to the gap..
Update to this http://www.pinkbike.com/photo/4448541/
You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login
25ft x 8ft set-up to the gap.. Update to this http://www.pinkbike.com/photo/4448541/
5 Comments
  • 1 0
 Well..
First off - ALL these logs are from regulated logging in the forest, and was contracted by the Forest and Nature Agency.
Second - We got ALL these SURPLUS logs, from that contractor, to support our build project.

So it´s a controlled project and in cooperation with those two agents and our local freeride division.
This project is only possible with help from all sides and the hard (free) work we put in it!
Build time for this stunt only is close to 200 man hours and counting. Every single log you see varies from 10lbs, to the big ones at 500lbs, ALL moved and stacked by hand, and the dirt counting in at almost 900 ft3...also moved and compacted by hand..

We do know a thing or two about digging...
  • 1 0
 Yep
..They where logged for selling ( thats a reality everywhere in the world i´m afraid ) and we saw the opportunity to get most of the surplus that was in the woods, to build from.
  • 2 1
 in my opinion thats a huge waiste of trees espeacaily if those are alive ,not beetle kill, like there is a such thing as digging
  • 1 0
 so your saying that the logs were going to be cut down anyways for other purpases so you said might as well put them towards jumps????
  • 1 0
 ser godt ud (: ive been there and its HUGE Wink