Powered by Outside
Start of the exit bridge on lower gnarbac. Lots left to do on it. Should be a good 200ft section when finished.
You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login
Start of the exit bridge on lower gnarbac. Lots left to do on it. Should be a good 200ft section when finished.
3 Comments
  • 1 0
 It sure is Jimmy! You ride a sweet bermed s turn into this bride, then up the ramp, smooth turn on to the skinny. ride the skinny for 30ft or so then there will be a wooden s turn to swing around two trees then it will go straight for a bit. After that a left hand turn on to a 2nd log, straight on that for a bit. Exit will be a wooden booter to gap.
  • 1 0
 Man, this is incredible. Is that a bridge feeding into a skinny/log?
  • 1 0
 Trail looks sweeeets!







Copyright © 2000 - 2024. Pinkbike.com. All rights reserved.
dv56 0.058856
Mobile Version of Website