Be prepared for a lot of problems. It takes so long to perfect a pump track so it is smooth. Believe me I've just finished building one after 4 or 5 months
Yeah, we've built this sort of stuff before, we have a trail which has loads of berms and pump rollers on it so we've got them pretty much dialed by now. I guess the type of soil will affect the smoothnes too.
Your pumptrack looks pretty fun, props.
yea cheers, ur right about different soil types. i mean u look at some trails in england where theres chalk and they are just total solid and smooth but ours took forever to get like that. Cool, if you have experience then it shouldnt be a problem