Powered by Outside
Oct 17th Work Party installing the connector trail from Kingsley Resevoir to Upper Post Canyon.
You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login
Oct 17th Work Party installing the connector trail from Kingsley Resevoir to Upper Post Canyon.
4 Comments
  • 30
 :O i want one so bad!
  • 10
 that would make trailbuilding so much easier, then you could put the extra energy into making the jumps bigger Smile
  • 20
 This is a sweet unit.I would sell my left nut 4 one.
  • 10
 too steep and tight to use any thing other then hand tools at my local :/







Copyright © 2000 - 2026. Pinkbike.com. All rights reserved.
dv56 0.011181
Mobile Version of Website