mk2 design, shrunk linkage and idler pully added. axle path less rearward by a small amount. The two gears will be wrapped by a composite wraparound sleeve, bolted to the seatube and bb shell, to keep grit and stones out. Havent got round to drawing that up yet. Dropout details not done yet either.
looks sick, but mud etc might be an issue