The first and second turning processes. The blank is bored out, and then a hub starts to take shape. The hubs go through three turning and two milling steps.
You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login
The first and second turning processes. The blank is bored out, and then a hub starts to take shape. The hubs go through three turning and two milling steps.
0 Comments







Copyright © 2000 - 2024. Pinkbike.com. All rights reserved.
dv65 0.016871
Mobile Version of Website