Powered by Outside
You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Video player is disabled while the embed window is open.

Copy and paste the HTML code below:


Color:
Size: X


|

| |

59 days

January 1st 2015 Tidworth Freeride closed its gates for some much needed trail maintenance. General Berminator had haggard berms, Humps and bumps had lost its pop, sick note and Dhn were just suffering from plain neglect. With 59 days of #traillove at the hands of masters of #flowworks Tidworth Freeride is ready to welcome riders once again.

2 Comments

  • + 2
 Love it
  • + 1
 good work dudes, the tracks look awesome.








Copyright © 2000 - 2026. Pinkbike.com. All rights reserved.
dv56 0.011662
Mobile Version of Website