You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Video player is disabled while the embed window is open.

Copy and paste the HTML code below:


Color:
Size: X


|

| |

Building the re-route for the Rusty bridge

Penticton and Area Cycling Association (PACA) managed to wrangle together a good crew for this months trail day. The old bridge across Rusty needed replacing as well the entrance was not up to par. We chipped in a hundred meters of trail and a massive bench cut leading into the bridge. The bridge itself will be completed shortly.

0 Comments









Copyright © 2000 - 2024. Pinkbike.com. All rights reserved.
dv65 0.017244
Mobile Version of Website