You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Video player is disabled while the embed window is open.

Copy and paste the HTML code below:


Color:
Size: X


|

| |

2010-2011 Mountain Bike Operations Class Trail - Fuzzy Hugs

This is the trail built by the Mountain Bike Operations Students; over 2 weeks at Sprockids Park in Gibsons, British Columbia.

7 Comments

  • + 1
 Hell ya guys thanks for filming it
  • + 1
 Arye's Safari! aka "Mondslacker"
  • + 1
 Awesome work guys! Looks killer
  • + 1
 man, so dope. that was a fun time. choked i never got to ride it
  • + 1
 Seeek wish i was there at the end that looks fun
  • + 1
 looks fun!
  • + 1
 nice stuff

Post a Comment




Copyright © 2000 - 2018. Pinkbike.com. All rights reserved.
dv56 0.019874
Mobile Version of Website